With our gas transmission system,
we take responsibility for your future:
bayernets – reliable, sustainable & innovative

We are sustainably securing the future of Germany’s economy with our gas infrastructure, ensuring a gas supply our customers can count on – always.

With our gas transmission system,
we take responsibility for your future:
bayernets – reliable, sustainable & innovative

We are sustainably securing the future of Germany’s economy with our gas infrastructure, ensuring a gas supply our customers can count on – always.

Plan of measures

Here, we inform you about network development and maintenance measures that could result in temporary restrictions of your capacities.

Latest information

About capacity restricting measures

Maintenance Measures / Wartungsmaßnahmen 2024

Date                                                                                                          

 Affected Points and Capacity Products                                                                                                                                                                                                                                                       

 Level of Reduction

 Type of Measure

 Additional Remarks

From 02 Apr 2024, 07:00

To 03 May 2024, 17:00

Uberackern Entry/Exit
Interruptible, DZK (interruptible)


Uberackern 2 Entry/Exit
Interruptible, DZK (interruptible)


USP Haidach Entry/Exit
Interruptible, DZK/bFZK (interruptible)


Haiming 2-RAGES/bn Entry/Exit
Interruptible, DZK/bFZK/bFZK1 (interruptible)


Haiming 2-7F/bn Entry/Exit
Interruptible, DZK/bFZK (interruptible)

Increased probability
of interruption
Maintenance Compressor
Station Wertingen
 

From 08 July 2024, 06:00

To 19 July 2024, 19:00

Wolfersberg USP Exit

FZK, bFZK, Interruptible

 

Inzenham USP Exit

FZK, bFZK, Interruptible

FZK Exit reduced to 350 000 kWh/h per storage

bFZK Exit reduced to 350 000 kWh/h per storage

Interruptible Exit with high risk of interruption

FF01 / FW02 (Finsing) Maintenance 

From 02 September 2024, 07:00


To 11 October 2024, 17:00

Uberackern Entry/Exit
Interruptible, DZK (interruptible)


Uberackern 2 Entry/Exit
Interruptible, DZK (interruptible)


USP Haidach Entry/Exit
Interruptible, DZK/bFZK (interruptible)


Haiming 2-RAGES/bn Entry/Exit
Interruptible, DZK/bFZK/bFZK1 (interruptible)


Haiming 2-7F/bn Entry/Exit
Interruptible, DZK/bFZK (interruptible)

Increased probability
of interruption
Maintenance Compressor
Station Wertingen
 

 

Maintenance Measures / Wartungsmaßnahmen 2023

Date                                                                                                          

 Affected Points and Capacity Products                                                                                                                                                                                                                                                       

 Level of Reduction

 Type of Measure

 Additional Remarks

From 17 Apr 2023, 06:00

To 02 Feb 2024, 17:00

Uberackern Entry
Interruptible, DZK (interruptible)


Uberackern 2 Entry
Interruptible, DZK (interruptible)


USP Haidach Entry
Interruptible, DZK/bFZK (interruptible)

Increased probability
of interruption

Maintenance Compressor
Station Haiming

All firm entry products (bFZK, DZK, FZK) and all exit products (firm & interruptible) are not affected by this measure.

From 08 May 2023, 07:00


To 12 May 2023, 18:00

Uberackern Entry/Exit
Interruptible, DZK (interruptible)


Uberackern 2 Entry/Exit
Interruptible, DZK (interruptible)


USP Haidach Entry/Exit
Interruptible, DZK/bFZK (interruptible)


Haiming 2-RAGES/bn Entry/Exit
Interruptible, DZK/bFZK/bFZK1 (interruptible)


Haiming 2-7F/bn Entry/Exit
Interruptible, DZK/bFZK (interruptible)

Increased probability
of interruption

Maintenance Compressor
Station Wertingen

 

From 20 June 2023, 07:00


To 21 June 2023, 17:00

Uberackern Entry/Exit
Interruptible, DZK (interruptible)


Uberackern 2 Entry/Exit
Interruptible, DZK (interruptible)


USP Haidach Entry/Exit
Interruptible, DZK/bFZK (interruptible)

Increased probability
of interruption

Test Compressor
Station Haiming

This measure can increase the interruption probability of interruptible and interruptible DZK/bFZK entry and exit capacities at Uberackern, Uberackern 2 and USP Haidach. 

 

From 17 July 2023, 07:00


To 20 July 2023, 18:00

Uberackern Entry/Exit
Interruptible, DZK (interruptible)

Uberackern 2 Entry/Exit
Interruptible, DZK (interruptible)

USP Haidach Entry/Exit
Interruptible, DZK/bFZK (interruptible)

Haiming 2-RAGES/bn Entry/Exit
Interruptible, DZK/bFZK/bFZK1 (interruptible)

Haiming 2-7F/bn Entry/Exit
Interruptible, DZK/bFZK (interruptible)
Increased probability
of interruption
Maintenance Compressor
Station Wertingen

 

From 17 July 2023, 07:00

To 21 July 2023, 17:00
Inzenham-West USP Entry/ExitInterruption of all entry and exit flowsReplacement of equipment 

From 24 July 2023, 07:00


To 27 July 2023, 18:00

Uberackern Entry/Exit
Interruptible, DZK (interruptible)

Uberackern 2 Entry/Exit
Interruptible, DZK (interruptible)

USP Haidach Entry/Exit
Interruptible, DZK/bFZK (interruptible)

Haiming 2-RAGES/bn Entry/Exit
Interruptible, DZK/bFZK/bFZK1 (interruptible)

Haiming 2-7F/bn Entry/Exit
Interruptible, DZK/bFZK (interruptible)

Increased probability
of interruption
Maintenance Compressor
Station Wertingen
 

Cancelled

From 18 Sept 2023, 06:00


To 29 Sept 2023, 06:00

Uberackern Entry
Interruptible, DZK (interruptible)


Uberackern 2 Entry
Interruptible, DZK (interruptible)


USP Haidach Entry
Interruptible, DZK/bFZK (interruptible)

Increased probability
of interruption

Maintenance Compressor
Station Haiming

All firm entry products (FZK, bFZK, DZK) and all exit products (firm and interruptible) are not affected by this measure.

From 09 October 2023, 07:00

To 15 October 2023, 18:00
Uberackern Entry/Exit
Interruptible, DZK (interruptible)

Uberackern 2 Entry/Exit
Interruptible, DZK (interruptible)

USP Haidach Entry/Exit
Interruptible, DZK/bFZK (interruptible)

Haiming 2-RAGES/bn Entry/Exit
Interruptible, DZK/bFZK/bFZK1 (interruptible)

Haiming 2-7F/bn Entry/Exit
Interruptible, DZK/bFZK (interruptible)
Increased probability
of interruption
Maintenance Compressor
Station Wertingen
 

 

Maintenance Compressor Station Wertingen

29 November 2022, 08:00 a.m. – 29 November 2022, 04:00 p.m.

This measure can increase the interruption probability of interruptible entry- and exit-capacities and interruptible segments of bFZK and DZK entry- and exit-capacities at Uberackern, Uberackern 2, USP Haidach, Haiming 2-RAGES/bn and Haiming 2-7F/bn.

Maintenance Storage Inzenham

04 October 2022, 07:00 a.m. – 07 October 2022, 12:00 noon

Interruption of all entry and exit flows / all firm and interruptible capacities at Inzenham-West USP.

Maintenance Compressor Station Haiming

26 September 2022, 10:00 a.m. – 07 October 2022, 06:00 p.m.

This measure can increase the interruption probability of interruptible entry- and exit-capacities and interruptible segments of DZK entry- and exit-capacities at Uberackern and Uberackern 2.

The precise risk of interruption is not projectable. The measure only reduces our flexibility and can therefore - under certain conditions - increase the risk of interruption. The load flow scenarios that we have had during the last two month before publication of this measure (June/July 2022) would not have caused any interruptions even during these maintenance works.

Maintenance Storage Inzenham

18 July 2022, 06:00 a.m. – 22 July 2022, 05:00 p.m.

Interruption of all entry and exit flows / all firm and interruptible capacities at Inzenham-West USP.

Maintenance Compressor Station Wertingen

07 June 2022, 06:00 a.m. – 15 June 2022, 06:00 p.m.

This measure can increase the interruption probability of interruptible entry- and exit-capacities and interruptible segments of bFZK and DZK entry- and exit-capacities at Uberackern, Uberackern 2, USP Haidach, Haiming 2-RAGES/bn and Haiming 2-7F/bn.

Maintenance Storage Inzenham

11 April 2022, 07:00 a.m. – 14 April 2022, 04:00 p.m.

Interruption of all entry and exit flows / all firm and interruptible capacities at Inzenham-West USP.

Maintenance Compressor Station Wertingen

04 April 2022, 07:00 a.m. – 08 April 2022, 05:00 p.m.

This measure can increase the interruption probability of interruptible entry- and exit-capacities and interruptible segments of bFZK and DZK entry- and exit-capacities at Uberackern, Uberackern 2, USP Haidach, Haiming 2-RAGES/bn and Haiming 2-7F/bn.

Maintenance Compressor Station Haiming

04 April 2022, 06:00 a.m. – 13 May 2022, 05:00 p.m. (End of this measure has been moved from 12 August to 13 May 2022)

This measure can create a risk of interruption for already booked DZK (point-to-point) entry capacities at Uberackern 2. For this reason bayernets will suspend the short-term marketing (day, within day) of additional DZK entry capacities at Uberackern 2 for the above stated days. Furthermore, this measure can increase the interruption probability of interruptible entry capacities at Uberackern, Uberackern 2 and USP Haidach. The exit capacities (DZK or interruptible) at Uberackern, Uberackern 2 or USP Haidach are not affected.

Maintenance Compressor Station Wertingen

02 November 2021, 07:00 a.m. – 04 November 2021, 04:00 p.m.

This measure can increase the interruption probability of interruptible entry- and exit-capacities and interruptible segments of bFZK and DZK entry- and exit-capacities at Uberackern, Uberackern 2, USP Haidach, Haiming 2-RAGES/bn and Haiming 2-7F/bn.

Maintenance: pigging of section AK13 & EK26

25 October 2021, 06:00 a.m. – 29 October 2021, 06:00 p.m.

This measure might cause an interruption of firm FZK and bFZK entry capacities at Inzenham-West USP and Wolfersberg USP and can increase the interruption probability of interruptible entry capacities at Inzenham-West USP and Wolfersberg USP. Exit capacities are not affected by this measure. Other storages are also not affected by this measure.

Maintenance Compressor Station Wertingen

30 September 2021, 08:00 a.m. – 09 October 2021, 05:00 p.m.

This measure can increase the interruption probability of interruptible entry- and exit-capacities and interruptible segments of bFZK and DZK entry- and exit-capacities at Uberackern, Uberackern 2, USP Haidach, Haiming 2-RAGES/bn and Haiming 2-7F/bn.

Haiming: test of different ways of transport

06 July 2021 – 08 July 2021, every day from 09:00 a.m. to 04:00 p.m.

This measure can create a risk of interruption for already booked BZK (point-to-point) entry capacities at Uberackern 2. For this reason bayernets will suspend the short-term marketing (day, within day) of additional BZK entry capacities at Uberackern 2 for the above stated days.

Furthermore, this measure can increase the interruption probability of interruptible entry capacities at Uberackern and Uberackern 2.

The exit capacities (BZK or interruptible) at Uberackern or Uberackern 2 are not affected.

Maintenance Inzenham: Blocking of the station for the exchange of three ball valves

28 June 2021, 00:00 a.m. – 02 July 2021, 04:00 p.m.

Interruption of all entry and exit flows / all firm and interruptible capacities at Inzenham-West USP.

Maintenance Amerdingen 3: Installation Flow Straightener

12 April 2021, 08:00 a.m. – 23 April 2021, 04:00 p.m.

This measure can increase the interruption probability of interruptible entry- and exit-capacities and interruptible segments of bFZK entry- and exit-capacities at Uberackern, Uberackern 2, USP Haidach, Haiming 2-RAGES/bn, Haiming 2-7F/bn, Inzenham-West USP and Wolfersberg USP.

Maintenance Inzenham: Functional Test

12 April 2021, 07:00 a.m. – 15 April 2021, 04:00 p.m. and 05 October 2021, 07:00 a.m. – 07 October 2021, 04:00 p.m.

Interruption of all entry and exit flows / all firm and interruptible capacities at Inzenham-West USP.

Maintenance NUM: pigging of section 2 (AA30)

02 November 2020, 06:00 a.m. – 04 November 2020, 06:00 a.m.

This measure can increase the interruption probability of interruptible entry- and exit-capacities and interruptible segments of bFZK entry- and exit-capacities at Uberackern, Uberackern 2, USP Haidach, Haiming 2-RAGES/bn, Haiming 2-7F/bn, Inzenham-West USP and Wolfersberg USP.

Maintenance NUM: pigging of section 1 (AS29)

19 October 2020, 06:00 a.m. – 23 October 2020, 06:00 a.m.:

This measure can increase the interruption probability of interruptible entry- and exit-capacities and interruptible segments of bFZK entry- and exit-capacities at Uberackern, Uberackern 2, USP Haidach, Haiming 2-RAGES/bn, Haiming 2-7F/bn, Inzenham-West USP and Wolfersberg USP.
Furthermore, bayernets will restrict the offer of firm short-term (dayahead/withinday) bFZK und FZK entry-capacities at USP Haidach, Haiming 2-RAGES/bn, Haiming 2-7F/bn, Inzenham-West USP and Wolfersberg USP.

Maintenance GRMS Schnaitsee 3

From 05 October 2020, 8 a.m., until 17 October 2020, 4 p.m.

This measure can increase the interruption probability of interruptible exit-capacities and interruptible segments of bFZK exit-capacities at Uberackern, Uberackern 2, USP Haidach, Haiming 2-RAGES/bn, Haiming 2-7F/bn, Inzenham-West USP and Wolfersberg USP.

Maintenance at the GRMS Inzenham

From 13 July 2020 07:00 until 16 July 2020 16:00

Interruption of all entry- and exit capacities (firm and interruptible) at Inzenham-West USP.

Construction Work at GRMS Amerdingen

First Period from 02 June 2020, 6 a.m., to 14 June 2020, 6 a.m.

This measure might affect firm exit-capacities (FZK or bFZK) marketed at Uberackern, Uberackern 2, USP Haidach, Haiming 2-RAGES/bn, Haiming 2-7F/bn, Inzenham-West USP and Wolfersberg USP. BZK capacities (Point-to-Point) will not be affected. Due to this possible interference with FZK or bFZK capacities, bayernets reduced the offer of firm exit-capacities for this period.

Furthermore, this measure can increase the interruption probability of interruptible exit-capacities and interruptible segments of bFZK exit-capacities at the above-mentioned points.

Second Period from 14 June 2020, 6 a.m., to 06 July 2020, 6 a.m.

This measure can increase the interruption probability of interruptible exit-capacities and interruptible segments of bFZK exit-capacities at Uberackern, Uberackern 2, USP Haidach, Haiming 2-RAGES/bn, Haiming 2-7F/bn, Inzenham-West USP and Wolfersberg USP.

Pigging of MONACO pipeline

19 May 2020, 6 a.m., to 21 May 2020, 6 a.m., and 25 May 2020, 6 a.m., to 29 May 2020, 6 a.m.

This measure can increase the interruption probability of interruptible entry-capacities and interruptible segments of bFZK entry-capacities at Uberackern, Uberackern 2, USP Haidach, Haiming 2-RAGES/bn, Haiming 2-7F/bn and Inzenham-West USP.

Maintenance at the GRMS Inzenham

From 06 April 2020 to 09 April 2020, each day from 08:00 - 16:00 (CEST)

Interruption of all entry- and exit capacities (firm and interruptible) at Inzenham-West USP.

New measure - Maintenance at the GRMS Inzenham

From 05 August 2019, 7 a.m., to 08 August 2019, 5 p.m.

Interruption of all entry- and exit capacities in Inzenham-West USP.

Update: precise dates now specified Construction work: Integration of new pipeline at GRMS Amerdingen

From 05 August 2019 to 25 August 2019

This measure can increase the interruption probability of interruptible exit-capacities in Überackern 2, USP Haidach, Haiming 2-RAGES/bn, Haiming 2-7F/bn, Inzenham-West USP and Wolfersberg USP.

Maintenance work at the compressor station Haiming

23.07.2019 7a.m.-6p.m. and 24.07.2019 7a.m.-6p.m

Capacity reduction for the gas transport from the market area NCG (Germany) to the UGS Haidach.

The maximum possible flow (injection/withdrawal) for firm (FZK) and interruptible capacity is 1,785,437 kWh/h.

BZK (short-haul) capacity is not affected. 

Testing of the compressor station Haiming

08.,09.,15. and 16. July 2019 (each day from 8:30 a.m. to 2:30 p.m.)

This measure can increase the interruption probability of interruptible entry-capacities in Überackern, Überackern 2 and USP Haidach.

Test of GRMS Amerdingen

Update:

20.5.-22.5.2019 each day 7am – 5pm

This measure can increase the interruption probability of interruptible exit-capacities in Überackern 2, USP Haidach, Haiming 2-RAGES/bn and Haiming 2-7F/bn.

Construction work: Integration of compressor station Wertingen:

This measure can increase the interruption probability of interruptible exit-capacities in Überackern, Überackern 2, USP Haidach, Haiming 2-RAGES/bn and Haiming 2-7F/bn.

New time frame:

1. Period 10.10.2018, 7 a.m. – 11 p.m.
2. Period 11.10.2018, 7 a.m. – 11 p.m.
3. Period 22.10.2018, 7 a.m. - 01.11.2018, 12 p.m.

10.07.2018, 7 a.m. – 11.07.2018, 6 p.m.: Construction of GRMS Burghausen-Ort

  • This measure will not affect firm limited-allocable (BZK) entry and exit capacities at USP Haidach and Überackern 2.
  • Firm freely-allocable (FZK) entry and interruptible entry and exit capacity at USP Haidach and Überackern/Überackern 2 will be interrupted.


Please note:
The integration of the compressor station in Wertingen (below) has already been completed and will cause no further interruptions (status 30 October 2018, 11 a.m.).

09.07.2018, 6 a.m. – 17 July 2018, 6 p.m.: Integration of Monaco pipeline (status changed from 20.07.2018, 12 p.m. to 17 July 2018, 6 p.m.)

  • All flows at Haiming 2-RAGES/bn and Haiming 2-7F/bn will be interrupted.
  • This measure will not affect firm freely-allocable (FZK) entry and firm limited-allocable (BZK) entry and exit capacities at USP Haidach and Überackern 2.
  • Interruptible exit capacity at USP Haidach and Überackern/Überackern 2 will remain unaffected by this measure as long as the total amount of booked and nominated interruptible exit capacity at USP Haidach and Überackern/Überackern 2 does not exceed 4.006.800 kWh/h.

(For Entry nominations using freely-allocable capacities (firm or interruptible) at Überackern, Überackern 2 and USP Haidach in sum a maximum flow of 4.006.800 kWh/h (depending on the pressure delivered by the storage operator at USP Haidach) will be possible)

09.07.2018, 6 a.m. – 20.07.2018, 12 p.m.:

Integration of Monaco pipeline - new status: now:

09 July 2018, 6 a.m. – 17 July 2018, 6 p.m.: Integration of Monaco pipeline. For details see below.

05.07.2018, 7 a.m. – 6 p.m.: Testing of the compressor station in Haiming

This measure can increase the interruption probability of interruptible entry-capacities in Überackern, Überackern 2 and USP Haidach.

04.07.2018, 7 a.m. – 6 p.m.: Testing of the compressor station in Haiming

This measure can increase the interruption probability of interruptible entry-capacities in Überackern, Überackern 2 and USP Haidach.

23.04.2018, 0 a.m. - 25.06.2018, 12 p.m.: Integration of Monaco pipeline

  • This measure will not affect capacities at Haiming 2-RAGES/bn and Haiming 2-7F/bn.
    Furthermore, it will also not affect firm freely-allocable (FZK) entry and firm limited-allocable (BZK) entry and exit capacities at USP Haidach and Überackern 2.

  • Interruptible exit capacity at USP Haidach and Überackern/Überackern 2 will remain unaffected by this measure as long as the total amount of booked and nominated interruptible exit capacity at USP Haidach and Überackern/Überackern 2 does not exceed 4.006.800 kWh/h.

(For Entry nominations using freely-allocable capacities (firm or interruptible) at Überackern, Überackern 2 and USP Haidach in sum a maximum flow of 4.006.800 kWh/h (depending on the pressure delivered by the storage operator at USP Haidach) will be possible)

From 14th November 2017, 9 a.m., to 14th November 2017, noon

Emergency shutdown of the station Schnaitsee 1
This measure can increase the interruption probability of interruptible exit-capacities in Überackern and Überackern 2, but there will be no effects at USP Haidach, Haiming 2-RAGES/bn and Haiming 2-7F/bn.

From 9th November 2017, 9 a.m., to 9th November 2017, noon

Emergency shutdown of the station Lengthal 1
This measure can increase the interruption probability of interruptible exit-capacities in Überackern 2, but there will be no effects at USP Haidach.

From 8th November 2017, 1 p.m., to 8th November 2017, 4 p.m.

Emergency shutdown of the station Amerdingen
This measure can increase the interruption probability of interruptible exit-capacities in Überackern and Überackern 2, but there will be no effects at USP Haidach, Haiming 2-RAGES/bn and Haiming 2-7F/bn.

From 12th October 2017, 9 a.m., to 12th October 2017, noon

Emergency shutdown of the station Inzenham
All entry and exit flows at the station Inzenham-West USP will be interrupted.

Changed time frame: From 21st August 2017 to 31st August 2017, 4 p.m.

Construction of GRMS Finsing 2
This measure can increase the interruption probability of interruptible exit-capacities in Überackern, Überackern 2, USP Haidach, Haiming 2-RAGES/bn and Haiming 2-7F/bn.

From 13th June 2017, 8 a.m. to 3 p.m. and from 14th June 2017, 8 a.m. to 3 p.m.

Maintenance at the GRMS Amerdingen
This measure can increase the interruption probability of interruptible exit-capacities in Überackern, Überackern 2, USP Haidach, Haiming 2-RAGES/bn and Haiming 2-7F/bn.

From 4th May 2017, 9 a.m., to 4th May 2017, noon

Emergency shutdown of the station Forchheim
This measure can now be conducted without any effects on capacities.

From 4th May 2017, 7 a.m., to 4th May 2017, 6 p.m.

Testing of the compressor station in Haiming
This measure can increase the interruption probability of interruptible entry-capacities in Überackern, Überackern 2 and USP Haidach.

From 3rd May 2017, 7 a.m., to 3rd May 2017, 6 p.m.

Testing of the compressor station in Haiming
This measure can increase the interruption probability of interruptible entry-capacities in Überackern, Überackern 2 and USP Haidach.

From 4th April 2017, 1 p.m., to 4th April 2017, 4 p.m.

Emergency shutdown of the station Brannenburg
All exit flows for Kiefersfelden at the zone Kiefersfelden-Pfronten will be interrupted.

From 4th April 2017, 9 a.m., to 4th April 2017, noon

Emergency shutdown of the station Kiefersfelden
All exit flows for Kiefersfelden at the zone Kiefersfelden-Pfronten will be interrupted.

From 10th November 2016, 9 - 12 a.m.

Emergency shutdown at the GRMS Schnaitsee 1

This measure can increase the interruption probability of interruptible exit-capacities in Überackern, Überackern 2, USP Haidach, Haiming2-7F/bn and Haiming2-RAGES/bn. 

From 8th November 2016, 9 - 12 a.m.

Emergency shutdown at the GRMS Amerdingen

This measure can increase the interruption probability of interruptible exit-capacities in Überackern, Überackern 2, USP Haidach, Haiming2-7F/bn and Haiming2-RAGES/bn. 

From 8th November 2016 to 10th November 2016 (1 day within this period)

Maintenance at the GRMS Schnaitsee 1

This measure can increase the interruption probability of interruptible exit-capacities in Überackern, Überackern 2, USP Haidach, Haiming2-7F/bn and Haiming2-RAGES/bn. 

From 12th October 2016, 9 - 12 a.m.

Emergency shutdown at the GRMS Inzenham

Interruption of all entry- and exit capacities in Inzenham-West USP.

From 30th September 2016, 8 a.m. to 6 p.m.

Maintenance at the GRMS Amerdingen
This measure can increase the interruption probability of interruptible exit-capacities in Überackern, Überackern 2, USP Haidach, Haiming2-7F/bn and Haiming2-RAGES/bn. 

20. September 2016 05:50 pm

bayernets published two maintenance works for November 2016 at the GRMS Schnaitsee 1. We were able to combine both measures. For this reason the two maintenance measures will be replaced by the following:

From 10th November 2016, 7 a.m. – 6 p.m.

Maintenance at the GRMS Schnaitsee 1

This measure can increase the interruption probability of interruptible exit-capacities in Überackern, Überackern 2, USP Haidach, Haiming2-7F/bn and Haiming2-RAGES/bn.

20. September 2016 12:30 pm

Please note:
The below mentioned maintenance work at the GRMS Amerdingen has been cancelled.
There will be no capacity restrictions due to maintenance works.

12th July 2016, 6 a.m. - 6 p.m.

Grid Connection SWM Niederpframmern (Inzenham):
Interruption of all exit capacities at the storage Inzenham-West USP.
The period of the maintenance measure will be limited to 12th July 2016 6 a.m. - 6 p.m. (old staus: had to be extended from 8 a.m. - 5 p.m. to 0 a.m. - 6 p.m.)

10. June 2016 02:30 p.m.

Please note: This maintenance work at the underground storage site Wolfersberg (USP Wolfersberg) has already been completed. We expect no further restrictions due to this measure.

From 2nd June 2016, 07:00 p.m., to 12th June 2016, 11:59 p.m.

Former date: 1st June 2016, 00:00 a.m., to 12th June 2016, 11:59 p.m.

Maintenance at the storage Wolfersberg USP

Interruption of all entry- and exit capacities at the storage Wolfersberg USP.

Please notice: 
This measure can increase the interruption probability of interruptible exit-capacities in Überackern, Überackern 2, USP Haidach, Haiming2-7F/bn, Haiming2-RAGES/bn and Inzenham-West USP.

From 1st June 2016, 00:00, to 12th June 2016, 23:59

Maintenance at the storage Wolfersberg USP

Interruption of all entry- and exit capacities at the storage Wolfersberg USP.

From 17th May 2016 to 19th May 2016 (1 day within this period)

Maintenance at the GRMS Schnaitsee 1

This measure can increase the interruption probability of interruptible exit-capacities in Überackern, Überackern 2, USP Haidach, Haiming2-7F/bn and Haiming2-RAGES/bn. 

Measure postponed: From 10th May 2016, 8 a.m. to 4 p.m.

Former date: 6th April 2016, 9 a.m., to 26th April 2016, 4 p.m

Rebuilding of electronic systems at the GRMS Amerdingen.
This measure can increase the interruption probability of interruptible exit-capacities in Überackern, Überackern 2, USP Haidach, Haiming2-7F/bn, Haiming2-RAGES/bn, Inzenham-West USP and Wolfersberg USP.

Measure postponed: From 9th May 2016 to 12th May 2016 (every day from 8 a.m. to 5 p.m.)

Former date: 11th April 2016 to 15th April 2016 (3 days within this period)

Maintenance at the GRMS Amerdingen.
This measure can increase the interruption probability of interruptible exit-capacities in Überackern, Überackern 2, USP Haidach, Haiming2-7F/bn and Haiming2-RAGES/bn. 

From 4th May 2016, 7 a.m., to 4th May 2016, 6 p.m.

Test of compressor station in Haiming

This measure can increase the interruption probability of interruptible entry-capacities in Überackern, Überackern 2 and USP Haidach.

From 3rd May 2016, 7 a.m., to 3rd May 2016, 6 p.m.

Test of compressor station in Haiming

This measure can increase the interruption probability of interruptible entry-capacities in Überackern, Überackern 2 and USP Haidach.

From 25th April 2016, 7 a.m., to 28th April 2016, 5 p.m.

Maintenance at the GRMS Inzenham
Interruption of all entry- and exit capacities in Inzenham-West USP.

October 07th, 09:00 o`clock until October 30th, 17:00 o`clock

Maintenace works in the GRMS Inzenham and the upstream pipeline. During the above mentioned period all capacties to and from the underground storage site Inzenham (USP Inzenham) are interrupted.

October 07th, 09:00 o`clock until October 30th, 8:00 o`clock

Maintenace works in the GRMS Inzenham and the upstream pipeline. During the above mentioned period all capacties to and from the underground storage site Inzenham (USP Inzenham) are interrupted.

Update Oct 29th, 2015: action finished at 8:00 o`clock.

September 22nd, 07:00 o`clock until Septemer 23rd, 18:00 o`clock

Remodeling of the low voltage main distribution at the compressor station Haiming. Interruptible entry- and exit-capacities (Ü berackern, Ü berackern 2, USP Haidach, Haiming2-7F/bn, Haiming2-RAGES/bn) may be interrupted.

June 09th 2015, 09:00 o`clock until June 11th 2015, 17:00 o`clock

Overhaul of a control valve in the GRMS Amerdingen
Interruptible exit capacities (Ü berackern, Ü berackern 2, USP Haidach, Haiming 2-7F/bn, Haiming 2- RAGES/bn, USP Wolfersberg, USP Inzenham) may be interrupted.

May 20th, 07:00 o`clock until May 21, 18:00 o`clock

Maintenance work at the compressor station Haiming. This will affect the interruption probability of interruptible capacities in Ü berackern, Ü berackern 2, USP Haidach, Haiming 2-7F/bn, Haiming 2-RAGES/bn).

April 20th, 06:00 o`clock until April 24, 18:00 o`clock

Test runs at the compressor site Haiming.
Interrruptible entry- and exit-capacities (Ü berackern, Ü berackern 2 and USP Haidach) may termporarily be interrupted.

March 3rd, 08:00 o`clock until 16:00 o`clock

Meter exchange at the GRMS Schnaitsee 1
Interruptible exit-capacities (Ü berackern, Ü berackern 2, USP Haidach, Haiming 2-7F/bn and Haiming 2-RAGES/bn) may be interrupted.

December 9th, 09:00 o`clock until 15:00 o`clock

Compressor Station Haiming: Maintenance work at the grid node Burghausen (Ü berackern, Ü berackern 2, USP Haidach, Haiming 2-7F/bn, Haiming 2-RAGES/bn):
Periodic maintenance work at the compressor station Haiming.
Interruptable capacities may be interrupted.

July 7, 08:00 o`clock until July 10, 17:00 o`clock

Maintenance work at the grid node Burghausen (Ü berackern, Ü berackern 2, USP Haidach, Haiming 2-7F/bn, Haiming 2-RAGES/bn):
Periodic maintenance work at the compressor station Haiming.
Interruptable capacities may be interrupted.

May 12, 07:00 o`clock until May 15, 17:00 o`clock

Metering Station Inzenham-West: Maintenance work.
From May 12th until May 15th no gas flow possible from or to the Inzenham underground storage location.

18.09.2013 - 18.09.2013

On September 18th 2013, between 09:00 o`clock and 16:00 o`clock, the Amerdingen metering station will be shut down completely for tests of emergency shut-down programs and replacement of measuring sensors.

16.09.2013 - 17.09.2013

In the time from September 16th 2013, 08:00 o`clock until September 17th 2013, 16:00 o`clock only half of the Amerdingen metering station capacity will be available due to maintenance works (filter units, measurement)

06.08.2013 - 09.08.2013

In the time from the 06. August 2013 - started at 7:00 o´clock - to the 09. August 2013 - ended at 20:00 o´clock - the process control system of the compressor station Haiming will reconstructed. At the contempleted period the compressor station Haiming is not available

15.10.2012 - 19.10.2012

Gas pressure control and measurement station Inzenham -West - Planned maintenance and pressure container check in the station

17.09.2012 - 26.09.2012

Storage Wolfersberg - Planned maintenance

17.09.2012 - 27.09.2012

Gas pressure control and measurement station Anwalting - Planned bonding operation in the grid

13.08.2012 - 31.08.2012

Storage Wolfersberg - Planned maintenance

09.07.2012 - 12.07.2012

Storage Wolfersberg - Planned maintenance

10.05.2011-11.05.2011

Pipeline Inzenham - Egmating/IE 32-Repair work on pipeline

04.05.2011-05.05.2011

Compressor station Haiming - Reconstruction work on the gas valve/vent

01.06.2010-30.09.2010

Pipeline Finsing - Bierwang/FB 10 - Rerouting of pipeline in the commune Kirchdorf/company Schletter

14.05.2010-21.05.2010

Compressor station Haiming - Maintenance work on electric compressor

01.09.2009-30.09.2009

Pipeline Anwalting - Kissing/AK 13 - Rerouting of pipeline Derching and installation of valve group

26.08.2009-30.09.2009

Pipeline Ulm - Augsburg/UA 06 - Renewal of valve group at Kötz/Günzburg

25.05.2009-12.06.2009

PRS plant Denkendorf/9802 - Pigging of high pressure gas pipeline Laimerstadt - Denkendorf

01.04.2008-01.09.2008

Pipeline Finsing - Bierwang/FB 10 - Pipeline rerouting because of motorway construction work

01.04.2008-01.09.2008

Pipeline Egmating - Kissing/EK 26 - Rerouting of pipeline near Höhenkirchen

01.04.2008-01.09.2008

Pipeline Ingolstadt - Augsburg/IA 11 - Rerouting of pipeline/cargo transport centre Augsburg