Biogas

In principle, depending on location and technical parameters, network connection for biogas plants to bayernets’ gas transmission system is given priority and non-discriminatory access. bayernets is happy to support and advise you in the implementation of your project. For biogas plant operators, the provisions set out in Section 118 (4) of the Energy Industry Act (EnWG) are applicable for the network connection (until the end of 2026).

It is fundamentally possible to inject biogas into bayernets´grid along the whole gas transmission system. When you request connection to our grid, bayernets checks the technical requirements case-by-case at the desired network connection point. 

Injecting biogas into our grid generally requires checking the compatibility of the mixed gas with the gas quality specifications in accordance with current regulations and its interoperability with network customers directly or indirectly connected to the grid.

Your Contact from the Network Connection Team:

Fabian Schmitt

Strategic Network Development

Xenia Sultanova

Strategic Network Development

Application forms and the technical specifications for connecting to bayernets' gas transmission system according to Sections 17 and 19 of the Energy Industry Act (EnWG) are available here.