Overnomination
Are all requirements met? Check here if overnomination at the network point is possible.

Power Plant Deployment
Does the gas-fired power plant meet all requirements? Find out here whether additional measures are needed.

Data Platform
Discover more about capacities, load flows, nominations, interruptions, calorific values and the Wobbe Index.
Our Network Structure Data
You wish to know how long our pipeline network is, how many kWh we offtake every year, or what simultaneous annual peak load we handle? Here you will find updated and relevant information about our pipeline network in accordance with Section 23c Paragraph 4 S. 1 No. 1-5 of the Energy Industry Act (in German: Energiewirtschaftsgesetz (EnWG)) (as per: 31.12.2025).
Total length of high pressure pipeline:
1.707,6 km
Lengths of high-pressure level according to pipeline diameters:
Class | A | B | C | D | E | F | G |
Nominal diameter DN in mm | ≥ 1,000 | 700 ≤ x < 1000 | 500 ≤ x < 700 | 350 ≤ x < 500 | 200 ≤ x < 350 | 100 ≤ x < 200 | x < 100 |
Length in km | 87.4 | 400.7 | 487.1 | 366.4 | 329.0 | 27.4 | 9.6 |
Number of exit points in the high-pressure network:
200
Annual energy taken for network distributors and end consumers:
63,965,923,384 kWh
Annual energy taken in total:
139,266,599,802 kWh
Simultaneous annual peak load of all energy taken:
2,265,233 m³/h (08.06.2025 10:00 hrs)