With our gas transmission system,
we take responsibility for your future:
bayernets – reliable, sustainable & innovative

We are sustainably securing the future of Germany’s economy with our gas infrastructure, ensuring a gas supply our customers can count on – always.

With our gas transmission system,
we take responsibility for your future:
bayernets – reliable, sustainable & innovative

We are sustainably securing the future of Germany’s economy with our gas infrastructure, ensuring a gas supply our customers can count on – always.

Plan of measures

Here, we inform you about network development and maintenance measures that could result in temporary restrictions of your capacities.

Latest information

About capacity restricting measures

September 22nd, 07:00 o`clock until Septemer 23rd, 18:00 o`clock

Remodeling of the low voltage main distribution at the compressor station Haiming. Interruptible entry- and exit-capacities (Ü berackern, Ü berackern 2, USP Haidach, Haiming2-7F/bn, Haiming2-RAGES/bn) may be interrupted.

June 09th 2015, 09:00 o`clock until June 11th 2015, 17:00 o`clock

Overhaul of a control valve in the GRMS Amerdingen
Interruptible exit capacities (Ü berackern, Ü berackern 2, USP Haidach, Haiming 2-7F/bn, Haiming 2- RAGES/bn, USP Wolfersberg, USP Inzenham) may be interrupted.

May 20th, 07:00 o`clock until May 21, 18:00 o`clock

Maintenance work at the compressor station Haiming. This will affect the interruption probability of interruptible capacities in Ü berackern, Ü berackern 2, USP Haidach, Haiming 2-7F/bn, Haiming 2-RAGES/bn).

April 20th, 06:00 o`clock until April 24, 18:00 o`clock

Test runs at the compressor site Haiming.
Interrruptible entry- and exit-capacities (Ü berackern, Ü berackern 2 and USP Haidach) may termporarily be interrupted.

March 3rd, 08:00 o`clock until 16:00 o`clock

Meter exchange at the GRMS Schnaitsee 1
Interruptible exit-capacities (Ü berackern, Ü berackern 2, USP Haidach, Haiming 2-7F/bn and Haiming 2-RAGES/bn) may be interrupted.

December 9th, 09:00 o`clock until 15:00 o`clock

Compressor Station Haiming: Maintenance work at the grid node Burghausen (Ü berackern, Ü berackern 2, USP Haidach, Haiming 2-7F/bn, Haiming 2-RAGES/bn):
Periodic maintenance work at the compressor station Haiming.
Interruptable capacities may be interrupted.

July 7, 08:00 o`clock until July 10, 17:00 o`clock

Maintenance work at the grid node Burghausen (Ü berackern, Ü berackern 2, USP Haidach, Haiming 2-7F/bn, Haiming 2-RAGES/bn):
Periodic maintenance work at the compressor station Haiming.
Interruptable capacities may be interrupted.

May 12, 07:00 o`clock until May 15, 17:00 o`clock

Metering Station Inzenham-West: Maintenance work.
From May 12th until May 15th no gas flow possible from or to the Inzenham underground storage location.

18.09.2013 - 18.09.2013

On September 18th 2013, between 09:00 o`clock and 16:00 o`clock, the Amerdingen metering station will be shut down completely for tests of emergency shut-down programs and replacement of measuring sensors.

16.09.2013 - 17.09.2013

In the time from September 16th 2013, 08:00 o`clock until September 17th 2013, 16:00 o`clock only half of the Amerdingen metering station capacity will be available due to maintenance works (filter units, measurement)

06.08.2013 - 09.08.2013

In the time from the 06. August 2013 - started at 7:00 o´clock - to the 09. August 2013 - ended at 20:00 o´clock - the process control system of the compressor station Haiming will reconstructed. At the contempleted period the compressor station Haiming is not available

15.10.2012 - 19.10.2012

Gas pressure control and measurement station Inzenham -West - Planned maintenance and pressure container check in the station

17.09.2012 - 26.09.2012

Storage Wolfersberg - Planned maintenance

17.09.2012 - 27.09.2012

Gas pressure control and measurement station Anwalting - Planned bonding operation in the grid

13.08.2012 - 31.08.2012

Storage Wolfersberg - Planned maintenance

09.07.2012 - 12.07.2012

Storage Wolfersberg - Planned maintenance

10.05.2011-11.05.2011

Pipeline Inzenham - Egmating/IE 32-Repair work on pipeline

04.05.2011-05.05.2011

Compressor station Haiming - Reconstruction work on the gas valve/vent

01.06.2010-30.09.2010

Pipeline Finsing - Bierwang/FB 10 - Rerouting of pipeline in the commune Kirchdorf/company Schletter

14.05.2010-21.05.2010

Compressor station Haiming - Maintenance work on electric compressor